Notices
Copyright
Revision Record
Introduction
Introduction
Customer Responsibilities
Layout Guidelines
10BASE-2
Introduction
Network Layout Guidelines
NCR 7052/sx Cable Connections
BNC Solder Connector Installation (006-0087031)
BNC Crimp Connector Installation (998-0717342)
Bending The Cable
Checking the Coaxial Cable
Components
10Base-T
Introduction
Network Layout Guidelines
Recommended Hardware
Recommended Wiring
Installation
Mounting the StarLAN Hub
Connecting Power to the Hub
Connecting the Wall Boxes
Connecting the Workstations
Powering Up
Testing
Testing Ethernet In-store Wiring
Building a Wall Box for Tests A - C
Building a Wall Box for Test D - E
100BASE-T
Introduction
Network Layout Guidelines
Appendix
IEEE Standards
Hardware & Cable Part Numbers
System Map Template
PDF
NCR Ethernet Communications Wiring Guide
All Files
You are here:
10Base-T
>
Installation
>
Connecting the Workstations
Step 4: Connecting the Workstations to the Wall Boxes
1.
Connect the NCR workstations according to the plan prepared by the system analyst.
2.
Plug one end of the workstations drop cable into the wall box and the other end into the workstation.